Fiberglass work...
I spent some time doing some sanding on the tips for the horizontal stab. I mixed up another small batch of micro to fill in some areas. Maybe one more sand/fill session and they'll be ready.
I pulled out the right elevator and riveted on the tip which I had already prepped. With the tip on, I mixed up another batch of micro/epoxy and smeared it on one side to fill the gap between the aluminum and fiberglass.
Earlier, I gave Sandi the project of cutting our seat foam, so I went in to help her out a bit. I thought the foam was going to be cut to size but it wasn't... so I'm cutting it to give to the upholstery shop. I called them with dimensions, so they are ordering material.
(Time: 2.5 hrs)
I pulled out the right elevator and riveted on the tip which I had already prepped. With the tip on, I mixed up another batch of micro/epoxy and smeared it on one side to fill the gap between the aluminum and fiberglass.
Earlier, I gave Sandi the project of cutting our seat foam, so I went in to help her out a bit. I thought the foam was going to be cut to size but it wasn't... so I'm cutting it to give to the upholstery shop. I called them with dimensions, so they are ordering material.
(Time: 2.5 hrs)
