RV-9A Fuel Tank Construction Log
Tuesday, November 04, 2003
D&D, Misc
I deburred and dimpled the ribs. Scuffed up the flanges a bit for prosealing. I drilled the holes in the tank filler flange. Fabricated the vent tube clip doohickey. Drilled a 7/16" hole in the inboard rib for the vent line fitting.
I think I"m getting closer to being ready for assembling the fuel tank. Need to countersink the tank filler flange and dimple the holes in the skin for the filler flange. Need to wash the ribs and various components to get the dirt/grease off them. Then I think I'm ready!
(Time: 2.5 hours)

