RV-9A Fuel Tank Construction Log
Tuesday, November 11, 2003
Root rib fittings
Tonight I prosealed on the vent tube and fuel pickup fittings. No big deal. I also worked on countersinking the holes in the spar for the dimples in the tank. I think I've already done a good portion of this on the right wing spar.
Fuel pickup (inside)
Fuel pickup (outside)
Vent tube fitting (outside)
I saw a post in the RV-9 Yahoo group about self-etching primer in a aerosol can. Had to get some.. so I ordered two cans from a supplier in California. I then called around locally and found some so I grabbed 3 cans for $8.50/ea. Well today I came home to a package from the California vendor. $12/ea + $12 shipping!!! Ouch! Should have cancelled that order.
SEM Self-Etching Primer #39683
(Time: 1 hours)

