RV-9A Fuel Tank Construction Log
Tuesday, November 18, 2003
Test fit of tank on spar
The tank has had time to cure so I put it on the spar to check the fit. The fit is OK. Not perfect and not bad. The right tank will hopefully come out better.
I back drilled the remaining screw holes in the skin with the holes in the spar. Deburred and dimpled the holes. I need to fabricate a couple of stiffeners since the tank baffle doesn't run the lenght of the skin but I have holes clear to the end. This is actually a good thing as the skin would tend to pillow between the ribs I think.
Did a little cleaning and prepped to finish countersinking the spar for the nutplates.
I need to put on the tank access cover now and get it leak tested. Need to find some instructions on how to do it.
(Time: 1.5 hours)

