RV-9A Fuel Tank Construction Log
Tuesday, April 06, 2004
 
Finished countersinking
I finished countersinking the skin-to-baffle holes. I cleco'd the wing skins on set the tank up on the spar. Looks good. I need to do some positioning and then I can drill the z-brackets

Tank resting on spar.

(Time: 1.5 hours)

Powered by Blogger