RV-9A Fuel Tank Construction Log
Sunday, April 11, 2004
 
Marathon riveting of tank ribs
Decided to tackle riveting the tank ribs today, so I called Bill to come over. After 6 hrs of riveting all the tanks ribs are in except the root rib. There are three outboard ribs that need riveted but don't get proseal.

Before riveting.


After riveting with the baffle cleco'd on to hold it in place.

(Time: 8 hours)


Powered by Blogger