RV-9A Fuselage Construction
Wednesday, September 08, 2004
 
Drilling the F-631 roll bar
I drilled the 631B straps to the aft half of the roll bar. The first one went pretty good. The top strip really wanted to not sit down in the channel once it started going around the curve. I did what I could to keep it down. I shaved of some of the edge so the top half would sit far enough down to get the 1.5" thickness.

Bottom strip drilled and cleco'd

Top strip drilled in place.

Next I need to put the forward halfs of the roll bar on and drill them.

(Time: 2.5 hrs)

Comments: Post a Comment

Powered by Blogger