RV-9A Fuselage Construction
Thursday, September 16, 2004
Rollbar riveting
Started riveting the rollbar together. Riveted the two forward halves and then the two splice strips. I riveted the strips with the halves clamped to the table to keep it as flat as possible.
I riveted the aft halves together. I need to drill the 631D angle to it then I can complete the rollbar assembly. (Will do on Saturday)
(Time: 2 hrs)
Comments:
Post a Comment

