RV-9A Fuselage Construction
Thursday, September 16, 2004
 
Rollbar riveting
Started riveting the rollbar together. Riveted the two forward halves and then the two splice strips. I riveted the strips with the halves clamped to the table to keep it as flat as possible.

I riveted the aft halves together. I need to drill the 631D angle to it then I can complete the rollbar assembly. (Will do on Saturday)

(Time: 2 hrs)

Comments: Post a Comment

Powered by Blogger