RV-9A Wing Construction Log
Sunday, December 28, 2003
 
Assembled left flap, started right flap components
I assembled the left flap and drilled the spar/rib and skin/rib holes. Cleco'd on the nose skins.

I deburred and assembled the nose rib assemblies for the right flap, made the shim, started making the angle.

Left flap cleco'd for drilling.

(Time: 3.5 hours)


Powered by Blogger