RV-9A Wing Construction Log
Monday, December 29, 2003
 
Match drilled left flap, more assembly on right
Finished match drilling the left flap. Disassembled and deburred all the parts. Continued to work on the right flap. Drilled new holes in the work surface. (You can reuse two rows of holes.)

Nose skins cleco'd on.

(Time: 4 hours)


Powered by Blogger