RV-9A Wing Construction Log
Tuesday, February 10, 2004
Finished right flap
I pulled the right flap off the table tonight.. thought that 2 weeks should be enough for the proseal to setup, even if the garage is only 40 degrees. (Was actually relieved that I was able to get the cleco's out and it wasn't permantly attached to the table!)
I cleaned up the holes and riveted the trailing edge and put in the last few rivets.
(Time: 1.5 hours)

