RV-9A Wing Construction Log
Thursday, April 29, 2004
 
Bracketology
To use the term coined by Gary Newsted I believe, tonight was nothing but brackets to reinforce the flap attach brackets. There are 6 angles that need aligned and holes drilled in both flanges.

Outside bracket
Inside bracket

(Time: 2 hours)


Powered by Blogger